Kosciusko Water & Light
Kosciusko, Mississippi
Atwell & Gent provided all fieldwork, software modeling, and engineering required to prepare and provide Kosciusko Water & Light a complete System Study and 5-Year Construction Work Plan (CWP). The Study and CWP identified the need for a new fourth 13 kV feeder circuit along with a number of system-wide power factor correction, voltage regulation, system protection, sectionalizing, and selective coordination improvements.